Address
Contact Info
Description
Water crews will start this project Sept. 9. The project consists of installing 177 feet of 16-inch ductile iron pipe to connect a 20-inch to a 12-inch ductile main installed in the mid-nineties. This is in preparation for the future Zone 2 pump station upgrades off NW Fox Ridge Road.