A non-refundable application fee of $150 for water and $150 for power is required, and the Application Requirements on the cover page must be met before your application can be accepted. The fee will be applied to your project cost if you proceed with construction within 12 months of the accepted application date. A Customer Processing Fee of $28 will be collected on your first billing statement for each billing account established. Your Social Security number will be kept confidential pursuant to ORS 192.505(2), ORS 192.502(4).
APPLICANT MAY NOT AUTHORIZE A BILL TO A SECOND PARTY
Note: Any deviation from the electrical/water design once established, may result in incurring additional costs for re-design and material, and construction may be delayed. It is the applicant’s responsibility to provide all the necessary MW&L requirements and specifications to the contractor.>
I affirm that the above information is correct to the best of my knowledge. I have read and agree to the Commercial Service Design Application Requirements.